Laserfiche WebLink
The main reclaimed area, pond 2 reclamation, and pond 4 reclamation were traversed <br />on foot. Some small weed rosettes of Houndstongue and Scotch thistle were <br />mechanically removed. Reclamation activities at ground water wells LA 264 and LA <br />218 are not yet completed. The operator should complete the reclamation at these <br />sites this season in accordance with the approved permit and Rule 4.07. <br />Development Waste <br />The development waste pile was closely inspected. No sign of slump, slide, or <br />instability was noted. The pile outslope shows no rills or gullies indicating <br />drainage flow over the face of the pile from the upper pile surface. <br />4 <br />