My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC46045
DRMS
>
Back File Migration
>
Inspection
>
INSPEC46045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:48:58 PM
Creation date
11/18/2007 11:44:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
Inspection
Doc Date
11/25/2003
Doc Name
Asbestos Containing Materials Survey
From
Holcim (US) Inc.
To
DMG
Inspection Date
11/25/2003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br />As6ostos Containing <br />Materials Survey <br />4629 North Overland Trail <br />La Porte, Colorado <br />7. Recommendations <br />Asbestos has historically been used in many types of construction materials and <br />virtually all buildings constructed prior to 1980 have been found to contain asbestos. <br />The U.S. EPA has stated in its Summary of Managing Asbestos In-place (Green Book, <br />1990), "Intact and undisturbed asbestos materials do not pose a health risk." Given the <br />inactive status of much of the site and the low potential for disturbance of identified <br />ACMs, ARCADIS recommends no further action until the planned demolition of the <br />faa<lity occurs. <br />ARCADIS recommends that the findings of this asbestos survey be incorporated into a <br />Specification document. The Specification can then be provided for bidding purposes <br />to prospective asbestos abatement contractors prior to award of [he abatement and <br />demolition project. <br />The CDPHE Regulation 8 for asbestos in buildings requires a written asbestos <br />abatement design that must be included with a Specification if more than 1000 lineal or <br />3000 square feet of ACM is abated. Therefore, ARCADIS recommends that the <br />Specification include the requirements of a Project Design as discussed in the <br />regulation, and that the Specification be developed by a CDPHE-certified Project <br />Designer. <br />8. limitations <br />ARCADIS and Landmark performed asbestos survey services in a manner consistent <br />with the level of care and expertise exercised by members of the asbestos inspection <br />and assessment profession. Landmark and ARCADIS do not imply or guarantee that <br />every suspect ACM on or in the building has been identified or sampled. Access to the <br />some limited areas was not obtainable. Materials inside these areas are assumed [o be <br />ACMs. This inspection is intended to identify those components that are reasonably <br />suspect and are most likely to be ACM in quantities subject to regulation based on <br />existing industry and regulatory standards. <br />It should be nosed that destructive investigation of wall interiors or below-grade <br />structures was no[ done. In the event of demolition, asbestos could be discovered that <br />was not identified during this investigation. <br />jwo maroon ma.m"va~+-wawe.~n~rmem+,~.~,~.r ~,rosea <br />
The URL can be used to link to this page
Your browser does not support the video tag.