Laserfiche WebLink
<br />D. Item M. Miscellaneous Reclamation Costs <br />Currently our pumping electrical bills are approximately $1,000.00 a month. <br />The pump itself can be purchased for approximately $15,000.00. I would <br />therefore not expect the pumping costs to be spread over more than 30 days. As <br />a basis for the 30 day cost, $ 5,000.00 for de-watering should be quite <br />adequate. <br />E. Item M Seeding and Planting <br />We make reference to a memorandum from the Division dated March 3, 1982 from <br />James M. McArdle, Reclamation Specialist. In this letter they suggest various <br />trees and shrubs under Item 5 of the letter. The staff suggests that a mixture <br />of the following trees and shrubs be randomly planted. Our engineer, Nelson <br />Engineering, obligingly concurred with that recommendation which was <br />incorporated into a reclamation plan. Your method of calculations does not <br />meet the intent, and therefore this should be re-analyzed for both reclamation <br />purposes as well as bonding criteria. We intend to re-address this issue and <br />will produce an overall landscaping plan that is more consistent with the <br />property and the native vegetation. We therefore would request this amount be <br />reduced substantially until we can provide you with an acceptable alternative. <br />I would be very happy to meet with you in the near future to show you the <br />progress that we are making in our rehabilitation, and would also like to <br />finalize an amount for the bond before its anniversary date. <br />I would appreciate hearing from you in the near future. <br />Sincerely, <br />Siegrist Construction Co. <br />RalS~rE~ Est <br />President <br />RLS/ds <br />File: CDMG.ADL <br />