Laserfiche WebLink
o soil <br />p. _-- <br />Topsoiling is nearing completion at the site. Topsoil is stockpiled for re-spread at the toe of <br />slopes above pond 6 Additional topsoil is available in the approved topsoil borrow area to <br />complete the remainder of the topsoiling at the site. This activity will be completed as <br />weather and ground conditions allow. <br />Fish and Wildlife <br />Mule deer were noted in the undisturbed area east of Fill 8. Tracks on the reclaimed area <br />indicate significant usage by both deer and elk <br />Revegetation <br />Additional seeding of the disturbed areas has been completed since the last State <br />inspection. Broadcast seeding is normally done on the lower slopes. Hydro-seeding is used <br />on steeper areas, An excellent example of these two seeding methods can be seen in the <br />photo below. Dozer tracking of straw mulch indicates broadcast areas while smooth, tan <br />areas are evidence of hydro-seeding. <br />The Annual Reclamation Report for 2006 will document work completed for the year. <br />Overall, the site appeared in good condition for the early winter season. <br />