My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC45261
DRMS
>
Back File Migration
>
Inspection
>
INSPEC45261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:48:18 PM
Creation date
11/18/2007 11:40:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986033
IBM Index Class Name
Inspection
Doc Date
1/3/2006
Doc Name
Inspection Report
From
DMG
To
Sunnyside Gravel
Inspection Date
12/22/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 3) <br />MINE ID # OR PROSPECTING ID #: ~~-~ ea~_n~~ <br />INSPECTION DATE: »i~~in5 <br />INSPECTOR~SINI7IALS: KAP <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce theirseveritywhen considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1. <br />During the inspection, it was discovered that although there is topsoil reserved north of the <br />permit boundary, off site, there is no stockpile of topsoil located within the permit <br />boundary, which would be used for reclamation of the site. This is a problem related to <br />Rule 3.1.9 (3) of the Construction Materials Rules and Regulations for failure fo include <br />topsoil stockpile areas in the affected areas (within the permit boundary). <br />Corrective Acfion: Within 30 days of receipt of this report submit either a technical revision to <br />the Division specif~na that the topsoil stockpiles to the north of the permit will be reserved for <br />reclamation of the site, to include a reclamation plan for the stockpile area outside of the <br />permit boundary, and a signed agreement with the landowner that the stockpiled material <br />will hP resPrvec'1 far use in reclamation of the citPt or n canversinn to the permit axonndin~ the <br />~rmit hounctnry of the site to included the stack ilp Pct toosnil area- <br />CORRECTION <br />DATE <br />02/ O1 /Ob <br />PB or PV; ~B_ <br />TOPIC(S): ~`i <br />
The URL can be used to link to this page
Your browser does not support the video tag.