Laserfiche WebLink
HAUL TRUCK COST i PRODUCTIOX DATA NORISHEET cont'd Sheet 2 of 2 sheets <br />OPERATOR NAGES <br /> Fringe F.I.C.A Une~pl. Nk.Co~D. ) <br />Labor Classification lone Designation Base Rate Benefits (0.0170) (0.062) (0.125) Total ~ Shift Differential (S/hrl <br /> <br />Truck Operator -(IS-29cy) Zone A 514.11 53.49 51.09 50.88 f1.77 521.40 ~ Day shift: 50.00 <br /> lone B 514.67 53.49 51.13 50.91 51.83 522.03 ~ Sxing shift: 50.30 <br />Truck Operator -(30-39cY) Zone A 514.51 53.49 51.12 50.90 tl.Bl S2I.83 ~ Graveyard shift: 50.45 <br /> Zone B SI5.01 53.49 51.16 50.93 51.88 522.46 - ------ <br />Hechanic Zone A 514.71 t3.49 51.13 10.91 S1.S4 522.08 ~ 2 shift/day avg. 50.15 <br /> Zone 8 515.21 53.49 51.17 10.94 21.90 522.12 ~ 3 shift/daY avg. 50.25 <br />----------------- <br />ACAUISITION COST: <br />Base purchase price (CECG) <br />Less dealer discount (CECG B l0i) <br />Plus freight (CECG F 1.61) <br />Plus dealer charges (assuoe .3I) <br />Adiusted purchase price <br />Plus fazes: State sales B 3I <br />SHM @ 2I <br />Less [.ire cost iCEC61 <br />Less salvage value (CECG F IOI) <br />NET ACAUISIIIUN COST <br />----------------- <br />COST SUHMARY <br />5121 ,Z61.DD <br />512,176.10 <br />51,448.18 <br />[365.28 <br />SI11,89R.36 <br />53,356.95 <br />f2,237.91 <br />56,696.86 <br />511,189.E4 <br />599,60;.5 <br />-------------------- <br />SINGLE SHIFT <br />BASIS <br />Zone A Zone B <br />DOUBLE SHIFT TRIPLE SHIFT <br />BASIS BASIS <br />Zone A Zone B Zone A tone B <br />ilxnershiip Cost%Hr: 523 .03 523. 03 SI5.11 515.11 512.55 512.55 <br />Operating-Overhaul Cost/Hr: 521. 13 521. 24 521.13 521.24 521.13 521.24 <br />Operator Cost%Hr: 521 <br />----- .40 <br />--- 522. <br />----- 03 <br />--- 521.55 <br />------- 522.18 <br />---- <br />- 521.65 <br />--- <br />- 522.28 <br />- <br />---- <br />TOTAL CUST/HR : 565 .56 566. 30 557.E5 - <br />- <br />SSE.59 - <br />-- <br />555.33 - <br />- <br />556.01 <br />