My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC43941
DRMS
>
Back File Migration
>
Inspection
>
INSPEC43941
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:47:14 PM
Creation date
11/18/2007 11:34:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986104
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
11/16/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />^l <br />(Page 5) • <br />MINE ID N OR PROSPECTING ID q t4-86-104 <br />INSPECTION DATE 11-16-98 INSPECTOR'S INITIALS ACS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were <br />identified during Chis inspection. The problems should be corrected by the dates given, or they will <br />become possible violations. The possible violations should be corrected by the dates given to reduce <br />their severity when considered by the Mined Land Reclamation Board. The inspector noted on the <br />previous page should be notified of all corrective actions taken. <br />pR0BLEM5lP0SSIBLE VIOLATIONS <br />AND <br />CORRECTION <br />DATE <br />1. Problem PH-1: Lack of storm water controls along sides of Skillman Gulch allows <br />potentially contaminated runoff to enter the gulch and the Eagle river. <br />Corrective Action: Install storm water controls in the form of "Best Management <br />Practices" as discussed in the observations section of this report. <br />2. Problem PB-2: Secondary containment basins for above ground fuel storage tanks <br />require maintenance and freeboard evaluation. <br />Corrective Action: Re-anchor liner and evaluate containment basin sizing and <br />clean out/disposal requirements as discussed in the observations section of <br />this report. <br />3. Problem PB-3: LOSS of containment of two or three 55-gallon drums of herbicide <br />Corrective Action: Evaluate and remediate any contamination as discussed in <br />the observations section of this report. The correction date of 11/24/98 listed <br />above is for submittal of the initial characterization report. Subsequent <br />deadlines may be established as the process moves forward. <br />4/1799 <br />PB or PV PB <br />TOPIC(S) SP <br />2/1/99 <br />PB or PV PB <br />TOPIC(S) HB <br />11/24/98 <br />PB or PV PB <br />TOPIC(S) AT <br />
The URL can be used to link to this page
Your browser does not support the video tag.