Laserfiche WebLink
III. COMMENl3 - COM~IIANCE <br />Below are oam~enh an the ~:tfas- the owmxnh fncMrrJe tJVnwlon d o6servalbro mode duriip the inpectfon. Commenh <br />afro dasai~e arty enforcement aclforu tdam dutrp the Mpectlon and the facts d evldasioe suppartYg the enforcement ootbn. <br />Streeter Fill on ftle is J"i s ~, L °~ .Annual monitoring (doing the Zed calendar year quarter) <br />of Skeeter Fill survey monuments is required (Permit page 4.09-1 ). Fw the current year, this report <br />is on file in the inspector binder. For the previous year, see the Annual Reclamation Report. The <br />date of the most recent monitoring of Sfreeter Fill survey monuments on file is J~K ~e . L.~.y, <br />An annual inspection of the Skeeter fill is required 6y a registered engineer during the 2"d <br />calendar year quarter (Permit, page 4.09-2). For the curent year, this report is on file in the <br />inspector binder. For the previous year, see the Annual Reclarrypfion~eporf. the date of the most <br />recent registered engineer inspection Skeeter Fill on file is*~ ~` . LO°'~'. The date of <br />certification is ~ ~ I ~ ~ toov .Quarterly piezometer readings and spring and seep surveys <br />are required of the ection 16 Fill (Permit, 6rttil~it 19, page II a-d). Reports of these readings and <br />surveys are filed in the inspector binder unfit incorporated into an Annual Reclamation Report. <br />The date of the last Secton 16 Fill piezometer reading on file a ~ ~~ Z a-t L.T.o The date of the <br />most current springs and seeps survey of the Section 16 Fill on file is J~ S z ~, s.ova .Annual <br />monitoring (doing the Zed calendar year quarter) of Sector 16 Fill survey monumenh is required <br />(Permit, Exhibit 19, page II a-4). Fw the current year, this report ~ on file in the inspector binder. For <br />the previous year, see the Annual Reclamation Report. The date of the most recent monitoring of <br />Section 16 Fill survey monuments on file is T~~ ~ ,saw . An annual inspection of the Section <br />16 Fill is required by a registered engineer during the Zed calendar year quarter (Permit, Exhibit 19, <br />page II a-4). For the current year, this report is on file in the inspector binder. For the previous year, <br />see the Annual Reclamation Report. The date of the most recent registered engineer inspection <br />of the Section 16 Fill on file is J~'tR ~ z«~a The date of cert~cation is o .,T t 4. z oe,o . A <br />certified quarterly report, including a piezometer reading, survey of monuments, surficial slope <br />failure and springs and seeps is required of the West Pit Fill (Permit, Exhibit 19, page 1 a-4). These <br />reports are filed in the inspector's manual until incorporated into an Annual Reclamation Report. <br />The date of the most current survey of monuments of the West Pit Fill on file is J ~ ~ , +~ The <br />date of the most current West Pit piezometer reading on file is O~ t ~ t~ The most current <br />inspection for evidence of su~cial slope failure.on the face of the Wesi Pit Fill was conducted <br />(recorded on file) on ~~~. 2a , ?The most current inspection (record on file) for seeps and <br />springs on the face of the West Pit fill was accomplished on ~~ 1 Z ~, 2 ~ .The date of <br />certficafion of the most current report on file is J~ r '-1 two <br />17) Haul roads are certified by a memorandum dated 24 May 1996, on file in the inspector <br />binder. <br />18) NPDES (CDPS) permit CO-0045161 - Colowyo Coal Company LP., March 12, 1999, is on file in <br />Exhibit 7 (Volume 28) of the Permit. It expires March 31,2004. <br />19) Discharge monitoring reporh are on file in a binder (titled NPDES Reports Minesite & Loadout) <br />in the Environmental Office. The last report b for e o f ~ `t /e ~ through ae j e r. / 7 0 <br />20) The Stormwater Management Plan, COR-040209, dated February 9, 2000, is on file in Exhibit 7, <br />Section 2, of the Permit. <br />21) The Spill Prevention, Countermeasures and Confrol plan is dated September 8, 1998, and is on <br />file in Exhibit 7 of the Permit. <br />22) Copies of quarterly pond inspections are on file in the irupector binder. The last report, <br />cert~ed by a professional engineer on _ To / ~`! r z ono .reports inspections as follows: <br />Dischar a Point and Pond Identficafion Date Ins cted <br />Dischar a Point 001, Streeter Fitt t z .~ei <br />Dischar a Point 002, Work Area '~ 1 z raw <br />D'lschar a Point 003, I:,ossard Loadout s r s oer0 <br />H <br />Page ~ or ~ Pages, Date r;f~ InlNals +s . ~ <br />