My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC43826
DRMS
>
Back File Migration
>
Inspection
>
INSPEC43826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:47:08 PM
Creation date
11/18/2007 11:33:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
8/28/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,• <br />IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and <br />date of abatement for the violation, previous violations still requiring abatement and the termination of <br />violations cited during previous inspections. <br />NOV CV-2007-003 was issued as a result of 8/16/07 inspection. Required abatement items and dates for <br />abatement are as follows: <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />1) Replace or repair the five failed silt fence structures and install additional silt fence segments as <br />necessary to minimize flow concentration to individual silt fence structures and ensure proper <br />functioning. Install at least two additional silt fence segments along each of the channel berms on the <br />east and west sides of Channel "H", with corresponding berm breaks and water bars as necessary to <br />direct flow through the silt fenced berm breaks. Complete Remedial Action Item 1 by 8/30!07. <br />2) Construct berm break and water bar as necessary to direct flow of ephemeral channel into Channel "H", <br />at location near upper end of lower riprapped segment of Channel "H", where a small tributary channel <br />enters the disturbed area from the west. The channel was diverted to flow along the berm rather than <br />into Channel "N", which may have contributed to the failure of the SAE-#2 silt fence. Complete <br />Remedial Action Item 2 by 8130107. <br />3) Submit a properly amended Appendix page M(viii)-1 iv, showing additional silt fence and berm break <br />locations, within the technical revision application associated with permit renewal. Complete Remedial <br />Action Item 3 by 9/17/07. <br />There are no additional outstanding NOV abatements, and no enforcement actions were taken as a <br />result of this aerial inspection. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />Revised 2/97 <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.