Laserfiche WebLink
<br />`~ • • <br />N. Status of Problem Resolution <br />The following items concern problems identified at previous inspection. Problems are classified <br />into three categories. These are: (Z) problems resolved; (2) resolution still in process; and <br />(3) operator delinquent. The date that the problem is resolved or the date that the operator <br />is deemed delinquent is to be clearly stated. <br />1. Additional perimeter markers: Resolution Still in Progress. <br />2. Construction of diversion ditch from mine bench to sediment pond #1: Resolution <br />Sti11 in Progress. <br />3. Submit plans to keep outlet structure of sediment pond #1 clear: Problem Resolved. <br />4. Repair culvert at coal stockpile: Resolution Sti11 in Progress. <br />5. Complete sediment pond #3: Resolution Still in Progress. <br />6. Clean trash from switchback below mine bench and clean drainage culvert near the <br />switchback: Problem Resolved. <br />7. Submit plans to stabilize outslope of mine bench: Resolution Still in Progress. <br />