Laserfiche WebLink
~ • • <br />III. Problems, Recommendaticns and Compliance Dates <br />The operator is advised that the fo1_'owing problems have been identified during the inspection <br />and that failure to correct the problems may result in the Division taking an ENFORCEMENT ACTION <br />pursuant to CRS 1973, as amended, 34-33-123. (Recommendations and compliance dates are to be <br />cleazly noted. Dates are to be specific, e.g., January 31, 1981 and underlined) <br />1. Additional perimeter markers must be up by April 24, 1981. <br />2. Finish construction of the diversion ditch from the mine bench to pond #2 by <br />June I2, 1981. <br />3. Restore proper drainage grade along northern edge of the mine bench by June 8, 1981. <br />4. Repair the culvert at the coal stockpile area by Tune 8, 1981. <br />5. Complete sediment pond #3 by June 29, 1981. <br />6. Submit plans to stabilize the outslope of the mine bench by July 20, 1981. <br />