Laserfiche WebLink
(Page 3) <br />MINE ID / OR PROSPECTING ID ~ K-80-020 <br />INSPECTION DATE 07-19-95 INSPECTOR'S INITIALS CLK <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />The Operator ie required to poet the increased bond <br />amount within sixty days of receiving this report. <br />This is in accordance with Section 34-32-117(4)(b) and <br />(c), and Section 34-32-117{6)(a) of the Colorado Mined <br />Land Reclamation Act; and Rule 4.2.1 of the Colorado <br />Mineral Rules and Regulations which states; "in the <br />event the Office determines that the Financial Warranty <br />is insufficient to perform reclamation, the operator <br />shall have up to sixty (60) days to poet additional <br />Financial Warranty from the date of written notice from <br />the Office of such insufficiency." As an option, the <br />operator may perform additional reclamation on or <br />before September 30 to reduce the reclamation liability <br />eo that it is below the amount of the present bond. <br />CORRECTION <br />DATE <br />Sept. 30, 1995 <br />PB or PV PB <br />TOPIC(S) FN <br />PB or PV <br />TOPIC(S) <br />PB or PV <br />TOPIC(S) <br />