Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during the <br />inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br />evidence supporting the enforcement action. <br />This was a complete quarterly inspection of the McClave Canyon Mine. Operator contact <br />Rodney Head was present during the mine site inspection. Weather was clear and mild. <br />One item of concern was discussed with operator representatives Walter Whitledge and <br />Rodney Head prior to the mine site inspection. The issue discussed was the pending permit <br />transfer from Lodestar Energy Incorporated (LEI) to Central Appalachia Mining (CAM). The <br />federal coal leases have been assigned to CAM, as a consequence of the LEI bankruptcy <br />proceedings, but the lease assignments have not been approved by BLM. The Division may <br />not be able to approve the permit transfer until BLM approves the lease assignment to CAM. <br />BLM has not approved the assignment, because of a royalty payment default by LEI. The <br />operator representatives stated that CAM was willing to pay the required amount, but they <br />had received conflicting information from Minerals Management Service (MMS) regarding <br />the amount owed. <br />Following the inspection, I contacted Karen Purvis of the BLM State Office, Solid Minerals <br />Branch. Ms. Purvis stated that she also had received conflicting information from Minerals <br />Management Service (MMS) regarding the royalty amount that would need to be paid. She <br />indicated that the royalty issue was limited to Loose #0125439, and she further stated that <br />the issue could be resolved in one of two ways; CAM could pay the required amount or <br />CAM could refuse to pay and the amount could be taken from the lease bond. I passed this <br />information along to my superiors in the Denver office. <br />Availability of Records <br />Required records were on file and up to date through the 3r° Quarter, 2003. Refer to the <br />attached DMG AVA/LABILITY OF RECORDS form. <br />Roads <br />The haul road was properly maintained. Coal was being loaded and hauled during the <br />inspection, and the road and coal handling areas were properly watered to suppress dust. <br />Hydrologic Balance <br />Water level in the sediment pond was approximately 3 feet below the primary spillway <br />elevation. <br />Maintenance items noted in the previous inspection report had been addressed. <br />Specifically, a small quantity of pond cleanout material had sloughed over the berm of the <br />designated containment area. This material had been properly cleaned up and the stored <br />material had been properly moved back away from the berm. Also, the office area silt fence <br />had been re-set and rocky material had been placed immediately in front of the silt fence to <br />prevent undercutting. However a small hole was observed in the silt fence material at the <br />north end. The silt fence will need to be repaired or replaced. <br />