Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />EXCESS SPOIL AND DEVELOPMENT WASTE <br />There is approximately 6 inches of sediment pond cleanings from MB- <br />1 on the upper, northwest bench of the refuse pile. The Division <br />recommended that the berm around the outside be increased in size <br />to prevent any of the fine particles from flowing down the face of <br />the pile. The fine particles will be mixed with course reject <br />material from the screening plant before compaction of the next <br />lift. Silt fence has been replaced at the boundary between the <br />refuse and the subsoil.. <br />X 07IXS.It6 <br />