Laserfiche WebLink
<br />tP~e 31 <br /> <br />NONE D) N OR PROSPECTNI6 m N 1F81-165 <br />Di9PECT10N DATE 0821.95 PISPECTDR'S DYITL4IS SSS <br />The totlowlog problems (PB) andlar poselble vlolatloas (PV) (and suggested cortectlve actlops) were IdeatlBed durlag this Inepectlou. The problems <br />should be cortected by the dates glveu, or thep will become poselble vlolatlaps. The poselble vlolatloas aheuld be cortecled by the dates glvep to <br />reduce [belt severity when copeldered by the IlDned Land Reclamatlap Boazd. The luepector noted oa the previous page should be potlDed of all <br />cortectlve actloae takes. <br />PRO81®!SD'OSSDSLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. Sedlmeat cautrole sot Ip place to coaVOl sediment traaeoort ham the material excavated hom the 07126198 <br />mill Dad toupdatlau site. PB or PV PB <br />TOPIC(b~ SC <br />CORBECTIYE ACTION lIB, _, _ <br />Install apd malufalp adequate aedlmeut conVale for the materal that was excavated from the mill <br />teuudatloa site and pushed luto 6alpea 6ulrh. <br />2. The berm for eedimept copVOl azouud the upper topsoil stockpile le curteutly not adequate to 07126196 <br />coptrol tepeoll loss apd sedlmept Vaneport hom the topsoil stockpile to the clesu water dlverslou. PB or PV PB <br />TOPIC(S) MP <br />CORRECTIVE ACTION SC, HB, _ <br />Re-estabRah and malutalu the eedlmeat coaVOl berm around the upper topsoil stockpile uutll adequate <br />veeetatloa le established ou the tomoll stockpile to coatsol erosloa. <br />3. Noue I 1 <br />PB or PV _ <br />TOPIC(S) _ <br />