Laserfiche WebLink
<br />(Page 2) <br /> <br />NONE ID d OR PROSPECTING ID d 1431-1~ <br />a19PECTION DATE 08~21~95 BYSPECTOR'3 INPyIAIS SSS <br />OBSERVATIONS <br />Thle was a Dartlal luapectlou of the Neglected Ague conducmd at the request of the operator m lutroduce the uew permlttlug couepltaut for tWe mlue, <br />Trey ScoOeld. The operator ludlcamd that E. L. Ballard should be the uew permlttlng sari luepectlau contact Nv. Ballard will then be reepoaslble <br />for keeplag Trey informed sari up to date. <br />The areas reclaimed last assess are producing a Wce etaad of vegetatlou for Oret year growth. The uppermost mpeoll etockptle alts, for the moat <br />part, la the shade of lazge Vase. Subsequently, the vegetatloa did sot fair ae well to etablBze the etockplle. The operator has Gees laetrocmd m <br />restore the berm at the bottom of this etockplle la ao effort b prevent mpeoll loss hom erosion and to keep these euepeaded soDde out of the clean <br />water diversion ditch duet below the etockplle. <br />Now that the Division has approved the permit boundary locatlop for the site, the boundary should be mazked In a more permaaeat manner such ae <br />lases poste, blaze marks ou Vasa, etc.. <br />Oalaes Gulch was Bowleg approximately 3 OPM at the alts uutll the drainage hom the lower collapsed portal flowed Inm It sari lacreased the flow. <br />Excavatlan for the mill foundatlon has beau completed sad the reinforcing rebaz was belag placed tar the louadatloa Doar. The earth excavated <br />far the mIN alts wss pushed across the road and down lam the dralaage. The operator lateads to Dull this material back up snd use It far backDlDng <br />agalpet the [auudatlou when It Is completed. <br />The material pushed into the drainage does not have au9 eeUmeut control structures m prevent eedlmeatatloa of 6aiaes Gulch. It dose oat appear <br />that the material was pushed directly into the stream bed but It la close sari any slgnlDcaut precipltatlaa avast could cause sediment transport Into <br />the 6alaee Gulch Flow. Sediment control wIB Hoed m be Installed by the cortectloa date epeclBed for this problem oa page three of this report The <br />operamr wIB used m ensure that adequate sediment contralti are In place for all tumre disturbances, fir b bdtlaUa of tYe defrbaaee. Any o[ <br />these coatrole which are sot epeclBed la the approved permit may need to be lacorporamd lato Ne permit through the mchalcal revlsloa process. <br />The operator le encouraged m contact the Dlvlstou ofllce, prier m couductlug say operatlou not epeciDed In the permit to clarity whether a revision <br />m the permit le necessary ar not <br />Durlag this Inepectlon MDI was remladed that Dlvleloa laepectloa sari approval of the Ilaer material and lastallatlou far the mmporary cyaalde heap <br />leach material storage area le required. Oee of vtaqulae for a temporary Daer was dlecuased. The use of this material would sot be practlcal because <br />of the ease with which It can be puacmred sudlor mra. The material used will used m be able to wlthstaad pressure from equipment operatlaue <br />such ae backhoe meth dragging Dghtly across it without compromising Ito Inmgrity. <br />The steeper partlon at Oalnes Balch, above the 651eve1 adlt, is experiencing some dawn~cuttlug apparently due m some reconattuctlon of the drainage <br />la 1994. Thle eectloa of the gulch will used to be etablDzed agalaet further erosloa. Revegetatloa of this stretch should provide adequam etabltlty. <br />Flow Iu the gulch la minimal at this tlme sari tlmlug should be right to perform revegetatlou tasks. The seed mix approved la the reclamatlou permit <br />would be adequate for use for this purpoea. <br />I & E Contact Address <br />NAIL E. 4 Ballard <br />OP®tATOR IHne Development Inc. <br />STRE6'T 16360 Park Tea Place. Na. 325 <br />CITYISTATE!ZH' Houatoa. Texas T7084 <br />cc: Tom 611Be, DMB <br />^ C6 <br />^ BL <br />^ FS <br />^ ~ <br />^ ~~ (CH) <br />^ SE <br />^ WQCD (CH) <br />^ oTBER <br />Harald Lazar, Operator <br />