Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />BULLD02ER WORK <br />Task # : 001 <br />Date : 08/03/2006 <br />User : TAS <br />State :Colorado PermiUjob# : M-1987-074 <br />County :Eagle Abbreviation :none <br />Site :Dotsero Quarry Filename :M074-001 <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.44 NA <br />Operating cosUhour : $74.00 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $158.21 Total fleet cost/hour : $318.43 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 36,300 LCY factor : NA volume : 36,300 LCY <br />Source of estimated volume :permit <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 515.8 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 3.00 % (i <br />Average site altitude : 6,000 feet <br />Matedal weight : 2,400 Ibs/LCY <br />Weight description <br />Sand - Drv. loose <br />J08 TIME AND COST <br />Fleet size : 2 Dozers) <br />Operator skill : 0.75 (avc <br />Matedal consistency : 1.20 (Cat i <br />Dozing method : 1.20 (slc <br />Visibility : 1.00 (avt <br />Job efficiency : 0.83 (1 shift <br />Spoil pile : 0.80 (fnd <br />Push gradient : 1.07 (Cat i <br />Altitude : 1.00 (Cat I <br />Material weight : 0.96 (Cat i <br />Blade type : 1.00 (S/SL <br />Net correction : 0.73 <br />Adjusted unit production : 379.01 LCY/hr <br />Adjusted fleet production : 758.02 LCY/hr <br />Total job time : 47.89 Hours <br />Unit cost : $0.417 /LCY Total job cost : 315,153 <br />