My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC42821
DRMS
>
Back File Migration
>
Inspection
>
INSPEC42821
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:46:21 PM
Creation date
11/18/2007 11:28:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987074
IBM Index Class Name
Inspection
Doc Date
8/3/2006
Doc Name
Inspection Report
From
DMG
To
Mayne Industries Inc.
Inspection Date
6/27/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Filename : M074-000 County :Eagle <br /> Agency or organization name :Division Of Minerals & Geology <br /> Permit or job action :Final Reclamation <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Bac~l18 grade disturbed slopes to final configuration; 2:1 NA 1 1.0 $15,153 <br />002 -Re-vegetate 20 acres Q $500/acre NA 1 1.0 $10,000 <br />003 -MoWDemob reclamation equipment NA 1 1.0 $3,000 <br />includes inflation factor adjustment of <br />OVERHEAD AND PROFIT <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br /> <br />2.02 <br />1.05 <br />1.50 <br />10.00 <br />susrorALS: 3.00 $28,153 <br />TOTAL DIRECT COST' - $28,153 <br />of dimct total = $569 <br />of dimct total = $296 <br />hrs`...$/hr.• $39.38 total = $59 <br />of direct total = $2,815 <br />assume net hours = 50% o/task hours <br />TOTAL O 8 P = $3.739 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+O&P)= $37, tf9C <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contracUbid preparation : 4.25 % of cntr. NA total = $1,355 <br />Reclamation management and/or administration : 5.00 % o(cntr. NA total = $1,595 <br />CONTINGENCY- NA` NA total= NA <br />'contingencies accounted for at task level TOTAL INDIRECT COST= $7,189 <br />TOTAL BOND AMOUNT (direct+ indirect) _ $35,342 <br />
The URL can be used to link to this page
Your browser does not support the video tag.