My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC42795
DRMS
>
Back File Migration
>
Inspection
>
INSPEC42795
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:46:20 PM
Creation date
11/18/2007 11:28:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983178
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
6/1/1994
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (Page 3) • <br />MINE ID # OR PROSPECTING ID # M83-178 <br />INSPECTION DATE 06/01/94 INSPECTOR'S INITIALS RCO <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br /> CORRECT ION <br /> DATE <br />1. Though the affected area does not exceed the size of 08/31/94 <br />the permitted acreage, the permit area as observed does <br />not match the map of the permit area contained in the PB or PV: PB <br />records. TOPIC(S): AR <br />Operator will submit an updated description of the <br />permit area boundaries and detailed map, reflecting <br />present extent of affected land, locations of <br />activities and areas for future mining. <br />2. The permit area boundary was not clearly marked. 08/31/94 <br />Pursuant to Minerals Rule 6.7 the operator will mark PB or PV: PB <br />the boundaries of the permit area. Operator will TOPIC(S): SM <br />provide proof to the Division of the installation of <br />said markers by the date shown. <br />PB or PV <br />TOPIC(S) <br />
The URL can be used to link to this page
Your browser does not support the video tag.