Laserfiche WebLink
Elk Creek C-1981-022 <br />15 February 2007 <br />pg 3/3 ~~ <br />Topsoil: -The Elk Creek topsoil pile was still covered with snow but appeared to be stable at <br />the time of the inspection. No erosional problems were noted. <br />Air Resource Protection: -There were no problems with fugitive dust on any of the haul <br />roads or from the coal stockpile at the time of the inspection. <br />-The coal stockpile appeared to be at a normal level at the time of the inspection. Jim Kiger <br />indicated that the mine is currently moving the longwall due to roof issues and problems at <br />both the head and tail gates. <br />Overall, the Elk Creek and Sanborn Creek Mine site is in good condition. <br />