My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC42563
DRMS
>
Back File Migration
>
Inspection
>
INSPEC42563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:46:07 PM
Creation date
11/18/2007 11:27:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
5/13/1993
Doc Name
MOUNTAIN COAL CO WEST ELK MINE ACCESS HAUL ROAD CERTIFICATION AND UPDATED AIR POLLUTION EMMISSION
From
MOUNTAIN COAL CO
To
MLR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIROCON, INC. <br />6100 SOUTH IaB EAST <br />SUITE J10 <br />MURRAY, UTAH 61107 <br />TELEPHONE: Ie0113e6~95e5 <br />FA%: Ie011 2669fi61 <br />April 15, 1993 <br />b1s. Kaihleen Welt <br />Mountain Coal Company <br />West Elk Mine <br />P.O. Box 591 <br />Somerset, CO 81434 <br />ENCiIROCON, INC. <br />~~C~IV=D <br />MAY 13 1993 <br /> <br />RE: PROFESSIONAL CERTIFICATION OF MAIN HAUL ROAD <br />MOUNTAIN COAL COMPANY, WEST ELK MINE <br />SOMERSET, COLORADO <br />Dear Kathy: <br />This letter serves as the professional certification for the new haul road <br />segment constructed in the fall of 1991 for Mountain Coal Company. Charles C. <br />Rehn, served as the professional engineer during the design and construction of this <br />project. Mr. Rehn has seventeen years of experience in geotechnical engineering and <br />is registered in the state of Colorado. He has consulted for Mountain Coal Company <br />on various projects since 1984. <br />The rules and regulations for coal mining regarding certification is as follows: <br />"4.03.1(1) (d) The design and construction or reconstruction of haul <br />roads not within the disturbed area in accordance with 4.05.2(1) shall <br />be certified by a qualified registered professional engineer, if required <br />by the Division for good cause shown." <br />The project being certified is the new haul road segment located in the <br />northeast corner of the West Elk Mine site to serve as the main access for mine <br />personnel. The closure of the original haul road was caused by the construction of <br />the stack tubes and new crusher building. The new segment is approximately 2500 <br />feet long and is bounded by the lower refuse pile on the west and north sides and by <br />A~Compeny ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.