Laserfiche WebLink
Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTINATI NG FORM - EQUIPMENT MOBI LI2ATION / DEMOBILIZATION <br />________________________________________ ________________ <br />_________________________________________________________ <br />Task #... 008 Prep. by UHE Filename..M056-008 <br />Date..... 28-Feb-2000 Permit k M-95 -O56 Mine......Weber Pi[ No. 2 <br />Permit Action........ General 112c bond review <br />Task Description..... Haul reclamation equipment to and from job site <br />HOURLY EQUIPMENT LOST <br />--------------------= NOTE - This is a list to select from, not a list of mandatory items to include. <br />Mob/Demob Eqp. -Tract or 6x4, 75,000 l6 GVL1, 375 HP, diesel powered <br />-L [. Trailer 25 ton folding gooseneck, drop deck <br />-Med. Trai Ler 50 [on folding gooseneck, drPp deck <br />-Hvy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Car On-highway light duty truck, 4x2, 130 hp, 1 /2 ton rating, gasoline powered <br />-Hyd. Crane : Crave RT58E rough terrain hydraulic crane, 20 tan capacity, 125 hp, 70 ft. boom <br />-Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br />-Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 30,000 lb GVN, 210 NP, diesel powered <br />Las[ Update: ___________________________________________ _______________ _________________ __________ <br />August, 1997 (trucks) <br />--------------------- Lt. Rig Med.Rig Hvy.Rig Pilaff Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <br />_______________ <=25 T. <br />_________ 26-50 T. > 50 T. Car Crane <br />____________________________________________ Truck <br />_______________ Truck <br />_________________ Truck <br />__________ <br />______ <br />_____________________ <br />Ownership Cost/hr _________ <br />= 525.59 ____________________________________________ <br />528.10 531.38 51.73 524,12 _______________ <br />56.88 _________________ <br />512.66 __________ <br />57.88 <br />Operating Cost/hr = 528.38 530.17 532.34 54.82 531.48 519.57 525.56 511.82 <br />operator Cost/hr = 422,61 522.61 522.61 521.82 523.13 522.35 521.24 522.35 <br />Helper Cost/hr = 521.82 521.82 521.82 50.00 50.00 ED.00 50.00 50.00 <br />Total = 598.40 5102.70 5108.15 528.37 578.73 548.80 559.46 842.05 <br />NON-ROADABLE EQUIPMEN T: <br />--------------------- - Weight Ownership Haul Rig Fleet Si ze Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Cost/hr Cost/hr (no. haul ed) Cost/hr Cost/hr Cost/ea <br />CAT D8N SU-Blade 39.50 541.10 5102.70 1 5143.80 5102.70 <br />CAT 950E Loader 18.07 418.56 598.40 1 5116.96 598.40 <br />CAT 307 Excavator 7.25 510.70 598.40 1 5109.10 598.40 <br />Revegetaticn Equipmen t 10.00 510.00 598.40 1 5108.40 598.40 <br />_________________________________________________________________________________ __________________________________ <br />______________________________________________________________________ _____________________________________________ <br />Subtotals 4478.26 5397.90 50.00 <br />