Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />Suooort Facilities <br />The Division previously approved a technical revision application to allow use of the rail loadout by another entity <br />for storage, loading and unloading of specified materials. This use has not yet been implemented; there has <br />been no resumption of activity at the loadout. <br />The fruit stand at the South Portal area has been closed down for the season, and there was no activity at the <br />site. The South Portal openings were properly secured. <br />North Decline interseeding will be undertaken as soon as ground conditions allow; operator has the seed on <br />hand. <br />4 <br />