Laserfiche WebLink
<br />RECLP?tAT ION COST $VNPIAAY coned sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Des cripu on ~ Cosc (51 <br />Subtotal lKl: <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.) Task Descripc ion ~ Cosc 151 <br />________I__________________________________________________I,_________ <br />~ ~ <br />~ ~ <br />Subtotal (L1: <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Deserapc ion ~ Cosc 151 <br />~ ~ <br />17 ~ Demo lacion ~ 5],000 <br />14 ~ Seeding ~ 525.000 <br />~ Fencing ~ <br />15 ~ Mob/Demoh ~ $5.000 <br />Subtotal (M): 533,000 <br />TOTAL DIRECT RECLAMATION COSTS (subc o[a 1s A through M1: 5399,899 <br />II. INDIREC[ COSTS <br />A. CONTRACTOR'S OVERHEAD 4 P0.0FIT <br />Item No.~ Item Description ~ Cost 151 <br />__________________________________________________________I_.,.____.__. <br />1. ~ Public Liability Insurance.... 1.5501 of dir. ~ 55,427 <br />2. ~ Concraccor's Performance Bond 0.9]St of dit. ~ 57,412 <br />3. ~ [onccacto is pro Eic... ........ 10 .OOk of dat. ~ 514,990 <br />4. ~ Job Superintendent.. ~ <br />SubCOCa1 (A1: 541,825 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (di reC[ plus 0 6 P1: $393.]29 <br />B. DMG PROJECT ADMINISTRATION EKPEN$E$ <br />Lcem No.~ Item Descripc ion ~ Cost (51 <br />________~_______________________________________________..__I____________ <br />1. ~ Minerals Program Adman. Fee ac $.DOt of cnt r.~ 519.696 <br />NET INDIRECC COST PERCENCAC E: iB.15t Subrocal l8): 519.696 <br />TOTAL INDIRECT RE CLAMAi ION COSTS Isubc o[a 19 A chtough 81: 567,511 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus andicecc costs): Si 11, 410 <br />