Laserfiche WebLink
~~~ <br />.µ <br />RECLAMATION COST SUMMARY cone d sheet ] of 9 <br />H. EARTHNORN - STREAM CHANNEL RECONSTRUCTION <br />Task <br />_____ No.~ <br />__________ <br />~ Task Description <br />_______________________________________ ~ Cost <br />____I_______ <br />~ (51 <br />__-__ <br />Sub[ocal IH1: <br />I. EARTHNORR <br />Task No.~ <br />________I__.___ <br />DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL "" ' <br />Task Description I Cosc 151 <br />I <br />I <br />Subtotal (I): <br />T. EARTfMORR - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Descripc ion I Cost (51 <br />________I__________________________________________________I___________ <br />li I Import 80,666 cu. yd. copso it for 50 acres I 578.394 <br />13 ~ Respread BO,fififi cu.yd. topsoil over BO acres ~ 59,745 <br />Sub[o[al (S): 54].639 <br />