Laserfiche WebLink
<br />MINE ID # OR PROSPECTING ID !/ M-1986-061 <br />INSPECTION DATE 10/26/00 <br />(Page 41 <br />INSPECTOR'S INITIALS RCO <br />The following problems IPBI and/or possible violations IPVI land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />The site has infestations of noxious weeds (knapweed and thistlel. There is no 12/31 /00 <br />evidence of a weed control plan for the site, though one is required. PB or PV: PB <br />TOPICISI: RV <br />CORRECTIVE ACTION: The operator must submit an adequate weed control plan. If _ , _ <br />such a plan presently exists, a copy of it must be submitted by the date shown at <br />right, along with the written commitment to implement the plan beginning during the <br />first proper season. <br />If such a plan does not exist, one must be written, with the assistance of a qualified <br />weed control expert (private or public), and submitted by the date shown at right <br />accompanied by a written commitment to implement the plan beginning during the <br />first proper season. <br />The plan and commitment must be received by the date shown at right. <br />2. The site contains a significant amount of material imported from another site, though <br />no Notice has been submitted for such importation, pursuant to Rule 3.1.5191. <br />CORRECTIVE ACTION: The operator must submit the required Notice with all <br />pertinent details. The Notice must be received by the date shown at right. <br />There is evidence of stormwater-related damage on the site, though a stormwater <br />management plan is in the file and is required to be followed. <br />CORRECTIVE ACTION: The operator must ensure that a stormwater management <br />plan is implemented, so that run-on from offsite areas, run-off from onsite areas, <br />erosion and sediment transport are adequately controlled. A statement specifying <br />what structures and/or practices are being implemented must be received by the date <br />shown at right. <br />CERTIFICATE OF SERVICE <br />12/31 /00 <br />PB or PV: PB <br />TOPICISI: MP <br />12/31 /00 <br />PB or PV: PB <br />TOPICISI: SP <br />SC, ,_ <br />I, Bob Oswald, certify that I mailed a true and complete copy of this foregoing document, via U.S. Mail, first class postage <br />prepaid, on the signature date shown on page one. <br />I ~~~ Bob Oswald, Division of Minerals and Geology <br /> <br />