Laserfiche WebLink
Subsidence <br />Concrete has been poured in the collapse hoie at the Vdr•s>? ',' r,~,r The. backfiiling of subsoil <br />over the concrete has yet to be completed due to ~nclem~-~ ~ rr=ather <br />~.s <br />~ . <br />. .. ,1~, <br />',~ ~ ' r <br />L <br />collapse after concrete pour <br />Development Waste <br />The Development Waste Pile (DWP) was traversed and appeared in good condition, Except <br />for the upper surface, all outslopes have been previously topsoiled, mulched, and seeded. <br />The DMG estimates about 16.000 yards of available storage remains at the DWP for <br />sediment pond cleanings and coal stockpile footprints. <br />Overall, the site appeared in compliance and good condition for the late winter season. <br />