Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made ' <br />during the inspection. Comments also describe any enforcement actions taken during the inspection , . <br />'and the facts or evidence supporting the enforcement action. <br />T~soil <br />Soil type 103 in the vicinity of the high wall end of the current pit has been salvaged to the extent <br />possible. The operator did a good job at salvaging this topsoil from an azea previously <br />designated for zero recovery. <br />Please continue.to maintain the southern and eastern end of the stripped azea for the pit <br />excavation by ensuring that spoil and other material does not encroach on undisturbed ground. <br />Revegetation <br />The operator has done a good job at spraying for Canadian and Musk Thistle site wide. <br />However, it was noted that an abundance of thistle is growing on the southeast side of Pond Ol 1. <br />Please continue to control the growth of troublesome weeds. <br />