My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC41869
DRMS
>
Back File Migration
>
Inspection
>
INSPEC41869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:45:37 PM
Creation date
11/18/2007 11:23:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992069
IBM Index Class Name
Inspection
Doc Date
11/17/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (E) <br />________~__________________________________________________I____________ <br />~ ~ <br />________________________________________________________________________ <br />Subtotal (K): <br />____________ <br />L. DRILL HOLE/MONITORING NE LL SEALING <br />Task No.~ Task Description ~ Cost (E) <br />________I______________________________________________________________ <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (5) <br />Demolition <br />1 ~ Seeding ~ 517,515 <br />Fencing <br />4 ~ Mob/Demob ~ E1, 044 <br />________________________________________________________________________ <br />Subtotal (M): 518, 559 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 573,089 <br />____________ <br />!I. INDIRECT COSTS <br />____________________________________________________________________ <br />A. CONT RALTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (E) <br />________I______________________________________________________________ <br />7. ~ Public Liability Insurance.... 1.SSOX of dir. ~ E7, 133 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ E1, 133 <br />3. ~ Lontrac to is Prof i[........... 10.OOY, of dir. ~ E7, 309 <br />4. ~ Job Superintendent.. <br />Subtotal (A): 59,575 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 582,664 <br />____________ <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost (E) <br />1. ~ Minerals Program Adm 5.00X of cntr.~ 54,133 <br />________________________________________________________________________ <br />NET INDIRECT COST PERCENTAGE: 18.767, Subtotal (B): 54,133 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 573,708 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 586,797 <br />
The URL can be used to link to this page
Your browser does not support the video tag.