Laserfiche WebLink
~, RECLAMATION COST SUMMARY con['d sheet 3 of 4 <br />H. EARTHNORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ <br />~ <br />~ Task Description ~ Cost <br />~ <br />~ (S) <br />Subtotal (H ): <br />I. EARTHUORK DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (S) <br />Subtotal (I): <br />J. EARTHNORK TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />2 ~ Topsoil 24.4 acres to 6" <br />Los[ (S) <br />515,693 <br />Subtotal (J ): E15,693 <br />