Laserfiche WebLink
• II. Compliant ~ t/[ C'olor,ido :surface Coul Minin~•:clamation Ilct <br />CRS 1973, as amended 3~l-33-101, et, sue., <br />' and the <br />' ` Rules and Regulations hsu~rl Pursuant to the Act <br />'Chic includes a listing of the particular provisions of t}[e regulatory program which were <br />examined doting the course of this inspection, and identifies enforcement actions taken <br />during the .i'hspection for failure to comply with the Rules and Regulations, the Act and <br />the permit. <br />4.OI General Obligations <br />The operator was unable to locate a copy of the MLRD permit, however, a letter from <br />Roger Funston demonstrated that the Doard had approved the application. This is <br />adequate documentation. <br />9.02 Signs and MarY.crs <br />The mine and permit identification siync are in place. <br />4.05 Hydrologic Dalance <br />The sur.Face drainage control system is in compliance. Apex is monitotiny downstream <br />~+a ter quality with P6M's upstream station on TrouC Cr cck. Mr. and Mrs. YorCy, the <br />downstream landowners, will•not allow a station on t/~eir property. <br />