Laserfiche WebLink
<br />Page -3- <br />~Maior Structures in and Adjacent to Permit Area <br />Comments: <br />Topsoil Handling Rule 5.4 <br />Quantity of topsoil being salvaged <br />Procedures <br />Proper stockpile location <br />Stockpile stabilization <br />Depth of replaced topsoil <br />Stability <br />Comments: <br />Revegetation Rule 6.5 <br />Vegetation efforts on schedule <br />Site preparation proper <br />Fertilization needed <br />Suitable species <br />Estimate cover <br />Poisonous or noxious species <br />[geed control needed <br />Livestock use <br />!dildlife use <br />P.eseeding necessary <br />Fencing <br />Comments: <br /> <br />Problems Recommendations <br />Once operator has obtained local government approval, should submit proof of such <br />approval and submit the bonds to this operation so a permit can be issued. <br />General site description-Comments: <br />Stockpile of sand and gravel on property is not related to this mining operation, <br />but is a result to the cleaning out of the irrigation ditch by the ditch company <br />