Laserfiche WebLink
~.. ~ Page -2= • <br />Backfilling and Grading - Rule 6.1 <br />Addits and shafts <br />Final graded slopes-highwall elimination terraces <br />Overburden thickness <br />Spoil handling procedures <br />Erosion-rills or gullies/erosion control <br />Toxic, acid forming or combustile material handling procedures <br />Grading along contour <br />Slope <br />Stability <br />,lffect on lands outside permit area <br />Handling of drill or auger holes <br />Comments: <br />Protection of Hydrologic System Rule 6.2 <br />Dams <br />[rater leaving affected area <br />Surface caater monitoring <br />Diversions temporary/permanent <br />Stream channel diversions <br />Sediment Control/Maintenance of Ponds <br />Discharge structures <br />Acid or toxic materials <br />Ground water monitoring <br />Permanent impounds <br />Haul 5 access road drainage <br />Grade <br />Drainage Ditches <br />Culverts erosion control <br />Other transport facilities <br />Other agencies or permits <br />Presence of leachate <br />Comments: The mining plan if followed will provide protection to the <br />Big Thompson River and the irrigation ditch and groundwater on the site. <br />!dildlife <br />Rule 6.3 <br />Safet}• S Protection <br />Critical species observed <br />Fey species to Idhich habitat restoration is aimed <br />Comments: <br />