Laserfiche WebLink
~4-~~~- S°~~'b~~« C ~l~/y <br />I~~~,~ ~v <br />Backfilling and Grading: -The Operator has completed work at the area of the diesel <br />storage tank (including topsoil replacement). All of the Backfilling and grading work <br />appears to be completed. <br />Processing Waste: The refuse pile remains stable after the recent precipitation events. <br />There were no signs of erosion on the newly reclaimed slopes of the pile and very <br />little sediment was deposited in the 100-year ditch around the refuse pile or at the <br />inlet to Pond 4. <br />Topsoil: Topsoil has been spread over the entire mine site (including the regraded <br />pond 3 area and the area where the pcs clean-up at the old diesel storage tank was <br />just completed). There is a small (approximately 500 cubic yards) topsoil stockpile <br />that remains by the refuse pile for pond 4 when it is reclaimed. <br />Revegetation/Reclamation Success: The cover crop (oats) that was seeded last year <br />appears to be coming up on the recently regraded portion of the refuse pile. There <br />did not appear to be any growth on the other reclaimed areas at the time of the <br />inspection, <br />