Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID # M-77-575 <br />INSPECTION DATE 10-02-95 <br />INSPE(:TOR'S INITIALS SSS <br />The following problems IPBI and/or possible violations IPV) land suggested corrective actions) were identified during this inspection. <br />The problems should be corrected by the dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation Boartl. The inspector noted <br />on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1 . Annual reports indicate that mining activity is sporadic with periods of inactivity exceeding one year 01 /31 /96 <br />PB or PV PB <br />CORRECTIVE ACTION TOPICISI AR <br />Submit a notice of temporary cessation for the operation as specified in Rule 1.13.5(21 or submit an _, _, _ <br />application for a technical revision to the permit as specified in Rule 1 .13.7 which will create an <br />intermittent operating status for the Marvel Pit A third option is to reactivate the pit and submit a <br />notice of temporary cessation when, in the future, the operation is idle for 180 days or more <br />2. Affected area boundary markers are not adequate to delineate the boundary 04/30/96 <br />PB or PV PB <br />CORRECTIVE ACTION TOPICISI SM <br />Install affected area boundary markers so the boundary of the entire area to be disturbed by the operation _ _, _ <br />is readily identifiable <br />3. Topsoil/overburden stockpiles have not been revegetated to prevent erosion and weed infestation 05/31 /96 <br />PB or PV PB <br />CORRECTIVE ACTION TOPICISI TS <br />Take measures to control the weed infestation on the_ topsoil/overburden stockpiles and then revegetata the ES, SC, RV <br />stockpiles using the approved seed mix <br />4. NONE ~ / <br />PB or PV _ <br />TOPICISI <br />