My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC39931
DRMS
>
Back File Migration
>
Inspection
>
INSPEC39931
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:44:21 PM
Creation date
11/18/2007 11:13:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986148
IBM Index Class Name
Inspection
Doc Date
3/5/1999
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
2/26/1999
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION Ct~SUMMARY cont'd ~et 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Lost (S) <br />Subtotal (K ):=--__-__---_ ~ <br />L. DRILL HOLEJMONITORING HELL SEALING I <br />Task No.~ Task Description ~ Lost (S) <br />________I__________________________________________________I_________..__ <br />Subtotal (U: ', <br />M. MISCELLANEOUS RECLAMATION TASKS ~~ <br />Task No.~ Task Description ~ <br />________I__________________________________________________I_ Cost (E) I <br />___________ <br />7 ~ Demob ti onD ispose of 5'x10'x10' mass a E0.22.c.f.~ E110 <br />8,9 ~ Seeding As per attached worksheet E1,084 <br />Fencing <br />10 ~ Mob/Demob As per attached worksheet ~ 51,120 <br />Subtotal (M ): <br />- E2,314 <br />----------- <br />TOTAL DIRECT RECLAMATION LOS75 (subrotals A through M): <br />_ 84,855 <br />_._________ I <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT ^ <br />Item No.~ Item Description ~ <br />,____ <br />~___ <br />_ Cost (E) <br />________,.__ ~ <br />I <br />.,______~I_________________________.,______~______. <br />__ <br />1. ~ Public Liability Insurance.... 1.SSOX of dir. ~ I <br />E75 I <br />2. ~ Contractor's Performance Bond 1.SSOX of dir. ~ 875 <br />3. ~ Contractor's Profit........... 10.OOY. of dir. E485 <br />4. ~ Job Superintendent..Equi p. oper. serves as super. <br />Subtotal (A ): 8636 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus O 8 P): <br />_ f5,491 <br />___________ <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ <br />________I___________________________________________________ Cost (E) <br />___________ <br />1. ~ Minerals Program Admin. Fee at 5.00% of cntr.~ E275 <br />NET INDIRECT COST PERCENTAGE: 18.76% Subtotal (B): E275 <br />__________ _ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): ________ __ <br />E910 ~ <br />TOTAL PERFORMRNCE BOND AMOUNT (di rec[ pWs indirect costs): E5, 765 ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.