Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />N. EARTH40RK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (E) <br />I <br />Subtotal (H): <br />~ I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />' Task No,~ Task Description ~ Cost (E) <br />________I_____..___________________.,________________________I____________ <br />4 ~ Install pond outlet. Use 6" corrugated plastic ~ E621 I <br />pipe x 150' plus excavation cosCS. I I <br />Trench excav a 54.94/c.y. (b' to 10' deep) = E412~ ~! <br />6" corrugated plastic pipe a 1-39/ Lf. = E208.50 ~ ~, <br />~ i i I <br />1 <br />I <br />Subtotal (I ): E621 I <br />____________ <br />J. EARTHUORK - TOPSOIL/SUBSOIL REPLACEMENT ~~ <br />Task No.~ Task Description ~ Cost (E) i <br />_______..I__________________.,______.._____________.__________I____________ ~. <br />5 ~ Replace on-site stockpiled topsoil (900c.y.) on ~ E108 ' <br />east side pond slopes above waterline. 6" depth. <br />i <br />6 ~ Use scraper to remove 6" of topsoil from adj acent~ E343 'I <br />1 acre on west side, and replace on west pond <br />slopes above waterline. Assume 750c.y. ~ ~~ <br />Subtotal (J): E451 <br />