My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC39850
DRMS
>
Back File Migration
>
Inspection
>
INSPEC39850
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:44:19 PM
Creation date
11/18/2007 11:13:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978056
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Tusco Inc.
Inspection Date
1/23/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />P.~'~~ <br />Page 7 <br /> <br />open water by the mining operation and other areas will be backfilled and <br />seeded. If the area is mined, backf111ing will take place and reclama- <br />tion will proceed as is discussed under Reclamation Phase V. The west <br />edge of Phase VII will be backfilled and seeded. <br />Phase VII-A <br />The west and east edges of Phase VII-A wi12 be backfilled and seeded. <br />As in Phases V and VI, the back half of Phase VII-A will be backfilled <br />as overburden becomes available. As soon as a sufficient area is <br />backfilled along the southern edge and will not be redisturbed it will <br />be seeded. After completion of backfilling, the shoreline areas will <br />be seeded. The east and west edges will also be backfilled and seeded. <br />Phase VIII-A <br />The west, east, and northern edges of this Phase will be backfilled <br />and seeded. <br />Phase IX-A <br />The west and southern edges as well as the edges of Plart Site III will <br />be backfilled and seeded. <br />Phase X-A <br />T' ke area will h een co eted and seeded. The northern edge <br />of the excavation up to the marsh a a located in the northwest corner <br />of Phase X-A will be backfilled and seeded. <br />The dike will be constructed approximately 100 feet wide s m sared from <br />the tap of the river side of the dike to the toe of th di a on the lake's <br />edge. The dike will be raised to a point approRimate y 9 feet bove the bed <br />of the Cache. La Poudre River. The top os the dike wi be ap oximately 30 <br />feet with the slope toward the lake at approximately 5:.., a dike on the <br />river side will be 2:1. The dike will. be seeded in the first appropriate <br />season following its completion. The river aide of the dike will be rip- <br />rapped with broken concrete and other suitable material. The interior <br />portion of the dike will also be te-enforced with similar material before <br />being covered with overburden and topsoil. <br />There will be three roads left on site after mining; these are being le t <br />the landowners request. One road crosses the properly on a st axis. <br />e two other roads wh a are a ng left as access t0 the property. <br />These roa..s w connect with the east-west; cne road will run between <br />Phases III and V and the other between Phases VIII-A and VI-A. <br />The office site and Plant Site II and III wilt not be mined, but will be <br />gzaded and seeded when they are no longer in use, <br />
The URL can be used to link to this page
Your browser does not support the video tag.