My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC39837
DRMS
>
Back File Migration
>
Inspection
>
INSPEC39837
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:44:18 PM
Creation date
11/18/2007 11:13:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976020
IBM Index Class Name
Inspection
Doc Date
10/29/2004
Doc Name
Inspection Report
From
DMG
To
Oldcastle SW Group Inc. dba Four Corners Materials
Inspection Date
9/2/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 004 <br />Date : 10/29/2004 <br />User : WHE <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County : La Plata <br />Site :Thomas Pit <br />Agency or organization name :OMG <br />Permit or other job action :Routine 112c bond review <br />Task description :Topsoil replacement for Irrigated field <br />HOURLY EQUIPMENT COST <br />B h' ~ C t D8R S ll 8U H <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 4,756 <br />asic mac ine . a eves - orsepower . 310 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Ownership cosUhour : $48.82 NA <br />Operating cosUhour : $66.09 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosUhour : $31.76 NA <br />Total unit cosUhour : $146.67 Total fleet cosUhour : $146.67 <br /> <br />LCY <br />Swell Loose <br />factor : volume <br />Source of estimated volume :Exhibit E, Reclamation Plan <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correctior <br />Average push distance : 150 .feet <br />Unadjusted hourly production : 685.7 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 7,000 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.433 /LCY <br />NA <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Permitfjob# : M-1976-020 <br />Abbreviation :none <br />Filename : M020-004 <br />Total job time <br />Total job cost <br />4,756 LCY <br />Source <br />0.75 <br />1.10 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />0.90 <br />1.00 <br />0.49 <br />338.68 LCY/hr <br />338.68 LCY/hr <br />14.04 Hours <br />$2,060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.