Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 10/29/2004 <br />User: WHE <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Agency or organization name : DMG <br />Permit or other job action :Routine 112c bond review <br />Task description :Topsoil replacement for pond area <br />HOURLY EQUIPMENT COST <br />. C ,,.,. <br />Basic machine . at D8R Senes 11 - 8U <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 3.260 <br /> Utilization <br />OwnershipcosUhour : $48.82 NA <br />Operating cosUhour : $66.09 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cosUhour : $31.76 NA <br />Total unitcosUhour : $146.67 Total fleetcost/hour: $146.67 <br /> <br />Swell Loose <br />LCY factor : NA volume : 3,260 LCY <br />Source of estimated volume :Exhibit E, Reclamation Plan <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Fac <br />Operator skill <br />Average push distance : 200 feet Material consistency <br />Unadjusted hourly production : 515.8 LCY/hr Dozing method <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Dry packed <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County : La Plata <br />Site :Thomas Pit <br />10.00 % (~ <br />7.000 feet <br />2,550 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size <br />Unit cost <br />1 Dozers) <br />$0.470 /LCY <br />Horsepower <br />Shift basis : 1 per day <br />Data source : (CRG) <br />0.75 <br />1.10 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.22 <br />1.00 <br />0.90 <br />1.00 <br />0.61 <br />Adjusted unit production : 312.20 LCY/hr <br />Adjusted fleet production : 312.20 LCY/hr <br />Total job time : 10.44 Hours <br />Total job cost : $1,532 <br />PermiUjob# : M-1976-020 <br />Abbreviation :none <br />Filename : M020-003 <br />Source <br />