Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 001 <br />Date : 05/26/2005 <br />User : GRS <br />State :Colorado <br />County :Moffat <br />Site :Moon Pit #2 <br />Permit/job# : M-1977-443 <br />Ahbreviation :none <br />Filename : M443-001 <br />Agency or organization name :Colorado Omg <br />Permit or other job action :Recalculate Bond <br />Task description : Cut dOWn hlgl <br />HOURLY EQUIPMENT COST <br />5793 bcY- Push 50 ft. <br /> Basic machine : Cat D8R Series 11 - 8SU Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $44.24 NA <br /> Operating cost/hour : $61.43 100 <br /> Ripper op.cost/hour : $0.00 NA <br /> Operator cosUhour : $24.01 NA <br /> Total unit cosVhour : $129.68 Total fleet cost/hour : $129.68 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 5,793 BCY factor : 1.120 volume: 6,488 LCY <br /> <br />Source of estimated volume :Permit <br />Source of estimated swell factor : NA <br />_. <br />,; <br />...... <br />HOURLY PRODUCTION <br />Job Condition Corcection Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fi// or embankment Spoil pile : 0.80 (fnd-r~ <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,000 feet Material weight : 0.71 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 3,250 Ibs/LCY Net correction : 0.39 <br />Weight description <br />Gravel - Pitrun Adjusted unit production : 543.98 LCYIhc <br /> Adjusted fleet production : 543.98 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 11.93 Hours <br />Unit cost : $0.238 /LCY Total job cost : $1,547 <br />