Laserfiche WebLink
CIRCES Cost Estimating Software <br />Agency or organization name : CO DMGI <br />Permit arjob action : t3ond Recalculation <br />.... <.. ~.:... ,: <br />TASK LIST (OIRECT COSTSI <br />NO. TASK DESCRIPTION <br /> <br />:a <br />FORM <br />USED <br /> <br /> <br />LEET <br />SIZE <br /> <br />.. <br />TASK <br />HOURS <br /> <br /> <br />IRECT <br />COST <br />001 -Cut down highwall 5,793 bcy 50 ft. push NA 1 12.0 $1,547 <br />002 -Push overburden over highwall to 3:1 8,000 bcy NA 1 27.0 $3,507 <br />003 -Spread topsoil 4,000 bcy 250 ft. push NA 1 18.0 $2,391 <br />004 -Finish grade plt floor Est. 4 hr @ $130.00/hr NA 1 4.0 $520 <br />005 -Revegetate pit NA 1 5.0 $1,957 <br />006 -Mob/Demob NA 1 4.0 $500 <br />' inGUdes inBation factor adjusMent or: NA <br />INDIRECT COSTS <br />SUBTOTALS . 70. fi <br />TOTAL DIRECT COST' <br />OVERHEAD AND PROFIT- Liability InSUranCe : 1.55 ~ Of d12Ct total = $162 <br />Performance bond : 1.05 % of direct total = $109 <br />Job superintendent : NA• NA NA total = NA <br />Profit : 10.00 % of direct total = $1,042 <br />'not required (oregp. operetorserves as super.) TOTAL O & P = $1,313 <br />LEGAL •ENGINEERING -PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+O&P)= $11,735 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contractlbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $587 <br />CONTINGENCY- NA' NA total= NA <br />' conti~encies accounted for at task level TOT AL INDIRECT COST = $1,900 <br />TOTAL BOND AMOUNT (direct + indirect) _ $12,322 <br /> <br />Date : 26-May-2005 Permit or job no.: M-19TT-443 Site :Moon Ph #2 <br />User : GRS Abbreviation : none State :Colorado <br />.Filename : M443-000 County :Moffat <br />