My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC39564
DRMS
>
Back File Migration
>
Inspection
>
INSPEC39564
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:44:09 PM
Creation date
11/18/2007 11:12:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
9/14/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 C-96-083 <br />Pg 3/3 14 Sept 04 ~~J <br />Support Facilities (cont.): -The lower water tank bench was stable and showed no <br />erosional problems at the time of the inspection. <br />-The bench for the substation by and for the coal preparation plant was stable and <br />had no erosional problems at the time of the inspection. <br />Topsoil: -Topsoil stockpile A was well vegetated and stable at the time of the <br />inspection. There were no erosional problems noted on the pile. The topsoil stockpile <br />sign was in place. <br />-The topsoil stockpile by gob pile 1 was well vegetated and stable at the time of the <br />inspection. There were no erosional problems noted on the pile. The topsoil stockpile <br />sign was in place. <br />Air Resource Protection: -The operator was watering the haul road to the gob piles, <br />the portal benches and the coal preparation plant bench during the inspection to <br />help control fugitive dust. There was no fugitive dust problem at the time of the <br />inspection. <br />-There was no fugitive dust problem at either the upper or the lower (main) coal <br />stockpiles. <br />-The operator was loading train cars at the time of the inspection and there was no <br />fugitive dust from the operation. <br />Bond Compliance: The main focus of this inspection was the bond compliance <br />portion. On the inspection pond sizes, bench areas, road lengths, the gob piles, coal <br />stockpiles and facilities were measured. All of the measurements were done with a <br />Trimble GeoXT handheld GPS unit with TerraSync software. Data processing was <br />completed using Trimble's GPS Pathfinder Office 2.90. All data points were field <br />corrected using integrated WAAS and post-collection processed using a <br />Compasscom Base Station. See the spreadsheet and maps at the end of the report <br />for more details. <br />