My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC39519
DRMS
>
Back File Migration
>
Inspection
>
INSPEC39519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:44:08 PM
Creation date
11/18/2007 11:11:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
6/18/1996
Doc Name
COAL INSPECTION REPORT
Inspection Date
6/12/1996
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a complete inspection conducted by David Berry and Mike <br />Boulay both of the DMG. Christine Johnston, Henry Barbe, and Norm <br />Avery of Mountain Coal Company (MCC) accompanied the DMG during all <br />or part of the inspection. The inspection was completed over the <br />course of two days. The weather was dry and hot on both days. <br />Day One Inspection (6/12/96): <br />HVdrOlOg1C Bd1aRCe <br />Maintain the culvert and continue to maintain adequate sediment <br />control and drainage at the Material Storage Bench where the access <br />road enters the bench on the west side to ensure continued <br />compliance. <br />Clean out and maintain the ditches and culverts at the Portal Bench <br />above the Portal Bench storage area to ensure continued compliance. <br />Devise a barrier where underground mine water discharges to surface <br />at the upper bench below the conveyor belt. Devise a strategy to <br />keep the discharge water in the ditch and not onto the bench <br />material. <br />Maintain straw bales or other measures above the inlet of culvert <br />that receives water from the MB-1 spillway to ensure continued <br />compliance. <br />Emergency spillway for MB-1 and FW-1 has some coaly material on the <br />upper edge of the spillway. MCC has agreed to clean this out by <br />installing a cut-off trench with a silt fence installed behind the <br />trench as a catchment. A water truck will be used to wash the coal <br />material out of the spillway where it will be collected and <br />removed. <br />Please continue to take measures to keep coal material out of ditch <br />that drains north from the Crusher Facility. <br />It was noted that mine inflow water was being discharged to FW-1. <br />The water was running fairly clear. <br />Please cleanout the culvert under the roadway located south of bays <br />5 & 6 of the "Underground Shop". <br />Please repair the minor damage to the culvert at the entrance to <br />Sylvester Gulch Access Road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.