My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC39401
DRMS
>
Back File Migration
>
Inspection
>
INSPEC39401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:44:03 PM
Creation date
11/18/2007 11:11:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000039
IBM Index Class Name
Inspection
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
5/8/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
., <br />(Page 3) <br />r <br />MINE ID # OR PROSPECTING ID: #M-2000-039 <br />INSPECTION DATE: 5/8/00 INSPECTOR'S INITIALS: JCS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1) There is no ID sign posted for the operation that meets the 7/1/00 <br />requirements of Rule 3.1.12 (1). <br />PB or PV: PB <br />An ID sign for the operation meeting the requirements of <br />the applicable Rule must be posted. Once done, the Division TOPIC(S): SM <br />is to be sent a picture of the posted ID sign. <br />2) The storm water control berm installed at the site is CORRECTION <br />located in the natural drainage. This does not agree with DATE <br />the installation of the storm water control berm as approved 7/1/00 <br />in the permit application. <br />PB or PV: PB <br />The storm water control berm currently placed in the drainage <br />must be removed and re-installed as approved in the permit TOPIC(S): HB, MP <br />application inside the permit area.(See the attached copy of <br />the pertinent part of the Exhibit E Mining Map.) The berm <br />should be extended across the access road as approved, possibly <br />as a "water bar", in order to comply with the approved permit <br />application and to maintain separation between storm water <br />from the pit and flow in the arroyo. Once the re-installation <br />is completed, the Division is to be notified in writing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.