My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC39243
DRMS
>
Back File Migration
>
Inspection
>
INSPEC39243
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:43:58 PM
Creation date
11/18/2007 11:10:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978009
IBM Index Class Name
Inspection
Doc Date
2/22/2005
Doc Name
Insp Rpt
From
DMG
To
Robinson Brick Company
Inspection Date
2/9/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 02/22/2005 <br />User : BMK <br />County : EI Paso <br />Site :Apache 9 <br />Agency or organization name :OMG <br />Permit or other job action : wamt <br />Task description :CUt I <br />HOURLY EQUIPMENT COST <br />calc <br />'gh wall garde to 3:1 <br />Basic machine : Cat D8R Series II - 8U Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $49.88 NA <br /> Operating cost hour : $69.39 100 <br /> Ripper op.cosUhour : $5.07 50 <br /> Operator cosUhour : $31.76 NA <br /> Total unit cosUhour : $156.10 Total fleet cosUhour : x156.10 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 64,460 CCY factor : 1.125 volume : 72,518 LCY <br /> <br />Source of estimated volume :exhibit e <br />Source of estimated swell factor :exhibit 1 <br /> <br />HOURLY PRODUCTION _...: <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiWday) <br />Consolidated stockpile Spoil pile : 0.80 (ind-rn <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,340 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.45 <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Adjusted unit production : 180.83 LCY/hr <br />Adjusted Fleet production : 180.83 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 401.03 Hours <br />Unit cost : $0.863 /LCY Total job cost : x62,601 <br />State :Colorado <br />PermiUjob# : M-1978-009 <br />Abbreviation :none <br />Filename : M009-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.