My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC39243
DRMS
>
Back File Migration
>
Inspection
>
INSPEC39243
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:43:58 PM
Creation date
11/18/2007 11:10:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978009
IBM Index Class Name
Inspection
Doc Date
2/22/2005
Doc Name
Insp Rpt
From
DMG
To
Robinson Brick Company
Inspection Date
2/9/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 002 <br />Date : 02/22/2005 <br />User : BMK <br />State :Colorado PermiUjob# : M-1978-009 <br />County :EI Paso Abbreviation :none <br />Site :Apache 9 Filename :M009-002 <br />Agency or organization name : DMG <br />Permit or other job action :FINANCIAL WARRNTY CAC AFTER INPSECTION <br />Task description :APPLY 6 INCHES OF TOPSOIL TO 67 ACRES <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series II - 8U <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 1-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $49.88 NA <br /> Operating cosUhour : $69.39 100 <br /> Ripper op. cost/hour : $5.07 50 <br /> Operator cost/hour : $31.76 NA <br /> Total unit cosUhour : $156.10 Total fleet cost/hour : x156.10 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 54,046 CCY factor : 1.215 volume: 65,666 LCY <br /> <br />Source of estimated volume :EXHIBIT L <br />Source of estimated swell factor :EXHIBIT L <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 400.0 LCY/hr Dazing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshiff/dayJ <br />Compacted hll or embankment Spoil pile : 0.80 (ind-rfJ <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,340 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.49 <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 195.30 LCY/hr <br /> Adjusted fleet production : 195.30 LCY/hr <br />JOB TIME AND COST ~~~ ~~ ~~ ~ ~ ~~~ ~~ <br />Fleet size : 1 Dozers) Total job time : 336.24 Hours <br />Unit cost : $0.799 /LCY Total job cost : x52,487 <br />Horsepower: 310 <br />
The URL can be used to link to this page
Your browser does not support the video tag.