Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 002 <br />Date : 02/22/2005 <br />User : BMK <br />State :Colorado PermiUjob# : M-1978-009 <br />County :EI Paso Abbreviation :none <br />Site :Apache 9 Filename :M009-002 <br />Agency or organization name : DMG <br />Permit or other job action :FINANCIAL WARRNTY CAC AFTER INPSECTION <br />Task description :APPLY 6 INCHES OF TOPSOIL TO 67 ACRES <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series II - 8U <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 1-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $49.88 NA <br /> Operating cosUhour : $69.39 100 <br /> Ripper op. cost/hour : $5.07 50 <br /> Operator cost/hour : $31.76 NA <br /> Total unit cosUhour : $156.10 Total fleet cost/hour : x156.10 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 54,046 CCY factor : 1.215 volume: 65,666 LCY <br /> <br />Source of estimated volume :EXHIBIT L <br />Source of estimated swell factor :EXHIBIT L <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 250 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 400.0 LCY/hr Dazing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshiff/dayJ <br />Compacted hll or embankment Spoil pile : 0.80 (ind-rfJ <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,340 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.49 <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 195.30 LCY/hr <br /> Adjusted fleet production : 195.30 LCY/hr <br />JOB TIME AND COST ~~~ ~~ ~~ ~ ~ ~~~ ~~ <br />Fleet size : 1 Dozers) Total job time : 336.24 Hours <br />Unit cost : $0.799 /LCY Total job cost : x52,487 <br />Horsepower: 310 <br />