Colowyo C-1981-019 <br />23 October 2006 tea--~,~ <br />Pg 5/7 <br />-The operator appears to have reached asteady-state operation in the West Pit. <br />Spoil from the current operation is being hauled and dumped in the middle of the <br />north side of the West Pit. Much of the north portion of the West Pit (between the <br />open pit and the West Pit excess overburden stockpile - Hink's peak) appears to be <br />graded at this point. This area appeared to be stable at the time of the inspection. <br />Support Facilities: -The facilities area was in good condition at the time of the <br />inspection. No problems were noted with the area. <br />- The Gossard Loadout was also in good condition at the time of the inspection. A <br />train was being loaded at the time of the inspection. <br />Topsoil: -The operator has finished the stripping topsoil in advance of the West Pit. All <br />of the topsoil has been placed in a stockpile just south of the East Pit. Grading work <br />on the pile needs to be completed and the pile needs to be seeded this fall to <br />minimize erosion and the loss of the resource. The topsoil stockpile appeared to be <br />stable at the time of the inspection. <br />-There are piles of dumped topsoil (enough to cover approximately 40 acres to a <br />depth of eight inches) in the East Pit that must be spread and seeded this fall. <br />- Some topsoil has been spread on the East Pit reclamation. A small area just north of <br />the 101 dragline has some minor rilling due to the recent precipitation. This area <br />needs to be repaired and reseeded this fall. <br />General Mine Plan Compliance: -The operator was currently removing overburden <br />from the B-Seam in the West Pit with the 103 dragline. The 102 dragline was building a <br />new pit road on the west side of the West Pit. The 101 dragline is in fhe East Pit <br />performing reclamation, as detailed in "Backfilling and Grading" above. <br />-The 1 14 shovel operation was currently working on removing the X-Seam <br />overburden of the West Pit. <br />- The operator was loading and hauling coal from the X-Seam of the West Pit. <br />-The Bower Brothers project has completed the bench at the E-Seam for the highwall <br />miner on the west side of the West Pit in Taylor Draw (and the highwall miner is almost <br />finished mining there). They were currently working on creating a bench at the E- <br />Seam on the east side of the West Pit in Taylor Draw for the highwall miner. The Bower <br />Brothers were just at the E-seam on the south end of the draw and will work their way <br />north, creating the bench as they go. Their current operation was loading <br />overburden with a Komatsu 750 LC loader into CAT 773D haul trucks. The loader was <br />making six passes to load each truck. The overburden was currently being hauled to <br />the edge of the Section 16 Pit in a large temporary overburden stockpile for final <br />reclamation of the Section 16 Pit. As the operation progresses to the north they will <br />short-haul overburden to create the bench and haul any excess to the temporary <br />overburden stockpile. The Bower work area, including the haul roads and fugitive <br />dust) was in good condition at the time of the inspection. <br />- The mining at the Colowyo Mine appears to be progressing as discussed and <br />approved in the PAP. <br />