Laserfiche WebLink
<br />of ~~<o~ COLORADO DIVISION OF MINERALS AND GEOLOGY <br />~~_- <br />„`'% o MINERALS PROGRAM INSPECTION REPORT <br />~. PHONE: (303) 866-3567 <br />~18Z6 t <br />The Division of Minerals and Geology has conducted an inspection of the mining operation noted below. This report <br />documents observations concerning compliance of the mining operation with the permit and the regulations of the <br />Mined Land Reclamation Board. The report notes 1) Areas of successful compliance; 2) Problems and suggested <br />corrective actions and/or 3) Possible violations to be considered for possible enforcement action by the Mined Land <br />Reclamation Board. OPERATORS SHOULD READ THIS REPORT CAREFULLY BECAUSE IT MAY REOUIItE <br />MINE NAME: Red Canyon Ouarry OPERATOR: Red Canvon . L.L.C. <br />COUNTY: INERAL: TYPE OF OPERATION: Surface 112 Ouarrv <br />INSPECTOR(S): .Tames Dillie i-. 7 Q ~~ <br />MINE ID # OR PROSPECTING #: M_I9R5-043 <br />INSPECTION DATE: fi-20-02 DATE OF COMPLAINT: Nnne <br />INSPECTOR'S INITIALS: ID TIME OF DAY (MILITARY): R30 <br />INSPECTION TYPE CODEitI: MI POST INSP. CONTACTStZI: CL & BL <br />JOINT INSP. AGENCY CODEIZI: CL & B L REASON FOR INSP. CODEi'1: IE <br />WEATHER CODEI4l: CL BOND CALCULATION TYPEI51: NN <br />OP. REP. PRESENT: Tom Smith & Telly Labus <br />1. INSPECTION TYPE CODE - [CLdN: IL=Illegal Operation, MI=Monitoring, hfP=Mineral Prospect, SI=Surety-related, PR=Pre-operation] <br />2. POST INSPECTION CONTACTS AND.TOINT INSPECTION AGENCY CODE - [CL-AG: NO=None, BL=BLM, CH=Colo. Dept. Health; ClrLand Board, <br />CT=Citizen; CW=Wildlife, FS=Forest Service, HW=Hwy. Dept., LG=Local Government, SE=State Engr.] <br />3. REASON FOR INSPECTION CODE - [CURS: AG=Other Agency Request, CT=Ci[izen Complainq IE=Normal I&E Program, HP=High Priority, PY=Priority] <br />4. WEATHER CODE - [CL-WE: CL=Cloudy, CR=Clear, [N=Inclement -prevented inspection, RN=Raining, SN=Snowing, WD=Windy) <br />5. BOND CALCOLATION TYPE: • [BC=Complete Bond, BP=Partial Bond, NN=None] <br />This list identifies the environmental and permit parameters inspected and gives a categorical evaluation of each. IF <br />PB OR PV IS INDICATED. YOU SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO <br />ASSURE COMPLIANCE WITH THE TERMS OF YOUR PERMIT AND APPLICABLE RULES AND <br />REGULATIONS. If PV is indicated, you will be notified under separate cover when the Mined Land reclamation <br />Board will consider possible enforcement action. <br />GENERAL INSPECTION TOPICS <br />(AR) RECORDS .................................... ~ (FN) FINANCIAL WARRANTY...... ~L (RD) ROADS................... DL <br />(HB) HYDROLOGIC BALANCE ............... PH (BG) BACKFH.L & GRADING....... 1~L (EX) EXPLOSIVES........... N- <br />(PW) PROCESSING WASTE/TAILING...... ~iA (SF) PROCESSING FACILITIES..... ~ (TS) TOPSOIL ................. DL <br />(MP) GENL MINE PLAN COMPLIANCE... ~ (FW) FISH & WILDLIFE ............... 1~L (RV) REVEGETATION..... 1~ <br />(SM) SIGNS AND MARKERS .................. ~ (SP) STORM WATER MGT PLAN... N (SB) COMPLETE INSP..... N <br />(ES) OVERBURDEN/DEV. WASTE........... ~ (SC) EROSION/SEDIMENTATION.. ~ (RS) RECL PLAN/COMP... N <br />(AT) ACID OR TOXIC MATERIALS......... t~A (OD) OFF-SITE DAMAGE .............. (ST) STIPULATIONS........ N <br />Y =Inspected and Found in Compliance PV =Inspected and Possible Violations Noted PB =Inspected and Problems Noted <br />N =Not Inspected NA =Not Applicable <br />ORIGINAL -PUBLIC Fn.E <br />