Laserfiche WebLink
r <br /> • • <br />II~ Compliance (con't) <br /> <br />4.b9 Disposal of Excess Spoil ~ <br /> <br />The operator has begun filling the first section of the East dump. <br />4.14 Backfillin2 and Gradine <br />The operator is in the process of grading the Stage 1 mine area. <br />4.28 Sunnort Facilities Not LocaCed at or Near the htinesite <br />The loadout site at Northgate was inspected. No problems were noted. <br />